Please ensure Javascript is enabled for purposes of website accessibility

2026 Road and Sidewalk Plan

The following road construction projects are planned for the 2026 construction season. (Please note, all plans are subject to change).

ROAD PAVING

  • Summer Street from Main Street (Bellingham line) to Holliston line.
  • Village/Holliston Street intersection
  • Holliston Street (Fairway Lane to Ellis Street)
  • Old Summer Street
  • Vernon Street
  • Fisher Street (Shady Lane to Townline)

SIDEWALK IMPROVEMENTS

  • Village Street (Matondi Square area)

Have you ever wondered what pavement treatments the Town uses to repair and maintain streets? (Scroll to the bottom of this page to watch a few short video demonstrations of the various processes). 

Current Construction Projects

WELL IMPROVEMENTS

  • Oakland Well

MEMORIAL SCHOOL

  • Roof Replacement
  • Pave Parking Lot (pending)

MCGOVERN ELEMENTARY SCHOOL

  • Bathroom Upgrades
  • Pave Parking Lot

HIGH SCHOOL

  • Air Quality Mitigation

 

Watch these videos to learn more!

What is Crack Sealing?

A crack seal is used to prevent water and moisture from penetrating roadways and is typically used when roadways are showing signs of cracking. Watch a YouTube video: Crack Sealing

What is Asphalt Milling?

Pavement milling is the process of removing at least part of the surface of a paved area, such as a road, bridge, or parking lot. Milling removes anywhere from just enough thickness to level and smooths the surface to a full-depth removal. Watch a video on Asphalt Milling

What is Paving?

Pavement (architecture), an outdoor floor or superficial surface covering; Road surface, the durable surfacing of roads and walkways. Road paving video courtesy of Smith Road Construction

What is Road Reclaiming?

Street reclaiming is the process of converting or otherwise returning streets to a stronger focus.  Watch a video on Road Reclaiming - Maple Street, Medway, MA