Please ensure Javascript is enabled for purposes of website accessibility
Notice 08-26-2026 : State Election is Tuesday, September 1, 2026 at the Medway Middle School, 45 Holliston St. from 7:00 am-8:00 pm. Early Voting is available at town hall during normal business hours (8/24-8/28).

2026 Road and Sidewalk Plan

The following road construction projects are planned for the 2026 construction season. (Please note, all plans are subject to change).

ROAD PAVING

  • Summer Street from Main Street (Bellingham line) to Holliston line - Complete
  • Village/Holliston Street intersection - final paving scheduled for Saturday, August 29, 2026.
  • Holliston Street (Woodland Road to Fairway Lane) - Road opened as of Friday, August 21, 2026 at 3:00 pm.  (Final top coat paving will occur on the observed Yom Kippur day in September).
  • Old Summer Street - Complete
  • Vernon Road - waiting topcoat
  • Fisher Street (Shady Lane to Townline) - Delayed to FY28

SIDEWALK IMPROVEMENTS

  • Village Street (Matondi Square area) - Complete

CRACK SEALING - Complete

  • Alexsandria Drive
  • Broken Tree Road
  • Causeway Street
  • Ellis Street (2 areas)
  • Walnut Street
  • Woodland Road
  • Hill Street (Winthrop to town line)
  • Lovering Street (Pond to Holliston).

2026 Construction Projects

Have you ever wondered what pavement treatments the Town uses to repair and maintain streets? (Scroll to the bottom of this page to watch a few short video demonstrations of the various processes). 

Current Construction Projects

WELL IMPROVEMENTS

  • Oakland Well - nearing completion, site restoration, power restablishment, paving, DEP approval all still needed.

MEMORIAL SCHOOL

  • Pave Parking Lot (pending)

MCGOVERN ELEMENTARY SCHOOL

  • Pave Parking Lot - Complete

 

Watch these videos to learn more!

What is Crack Sealing?

A crack seal is used to prevent water and moisture from penetrating roadways and is typically used when roadways are showing signs of cracking. Watch a YouTube video: Crack Sealing

What is Asphalt Milling?

Pavement milling is the process of removing at least part of the surface of a paved area, such as a road, bridge, or parking lot. Milling removes anywhere from just enough thickness to level and smooths the surface to a full-depth removal. Watch a video on Asphalt Milling

What is Paving?

Pavement (architecture), an outdoor floor or superficial surface covering; Road surface, the durable surfacing of roads and walkways. Road paving video courtesy of Smith Road Construction

What is Road Reclaiming?

Street reclaiming is the process of converting or otherwise returning streets to a stronger focus.  Watch a video on Road Reclaiming - Maple Street, Medway, MA