
2025 Road and Sidewalk Plan
The following road construction projects are planned for the 2025 construction season. (Please note, all plans are subject to change).
ROAD PAVING
- Village from Cottage St. to Matondi Square
- Samoset
- Shaw
- Colonial
- Diane
- Stephanie
- Kimberly
- Wildebrook
- First Colony
- Canal (dirt section)
CRACK SEALING
- To be determined
SIDEWALK IMPROVEMENTS
- Kimberly
- Stephanie
- Diane
- Laurelwood
- Village St. by Charles River
Have you ever wondered what pavement treatments the Town uses to repair and maintain streets? (Scroll to the bottom of this page to watch a few short video demonstrations of the various processes).
Current Construction Projects
HOLLISTON AND VILLAGE ST
Intersection improvements
HIGH SCHOOL
Culvert
CASSIDY FIELD PARKING LOT - in progress
Watch these videos to learn more!
What is Crack Sealing?
A crack seal is used to prevent water and moisture from penetrating roadways and is typically used when roadways are showing signs of cracking. Watch a YouTube video: Crack Sealing
What is Asphalt Milling?
Pavement milling is the process of removing at least part of the surface of a paved area, such as a road, bridge, or parking lot. Milling removes anywhere from just enough thickness to level and smooths the surface to a full-depth removal. Watch a video on Asphalt Milling
What is Paving?
Pavement (architecture), an outdoor floor or superficial surface covering; Road surface, the durable surfacing of roads and walkways. Road paving video courtesy of Smith Road Construction
What is Road Reclaiming?
Street reclaiming is the process of converting or otherwise returning streets to a stronger focus. Watch a video on Road Reclaiming - Maple Street, Medway, MA